Michael Howe Kitchen Fitting – Newton Aycliffe – Durham – Darlington
Posted in News, Recommended links by dave with Comments Off
Kitchen Fitting – Newton Aycliffe – Durham – Darlington
I have been involved in the Kitchen Industry for over 20 Years, I have witnessed a huge change in the level of kitchen fitting, because of the innovations and advancement of kitchen products. Long gone are the days that you could ring a joiner out of the local paper, and have your’e kitchen fitted at the level it should be finished off at with the features that are available. I offer a very competitive pricing structure for what ever level of work that may need carried out. Fully project managed any trade’s that may be required will be on hand at the highest level. It has took me many years to find people who are skilled and very reliable, this makes for a fantastic team of skilled tradesmen who are second to none.
CHECK OUT OUR COMPREHENSIVE KITCHEN FITTING SERVICE
Install Appliances including with plumbing and electrics.
Install Appliances with plumbing only.
Install Appliances with electrics only.
Install electrics – Dry Fit only (No electrics or plumbing)
Ducting through an external wall for tumble dryer or cooker hood.
Install a new consumer unit/or isolation consumer unit for kitchen only.
Upgrade existing earth cable to gas or water or both.
Install new or move existing single or double electric sockets.
Install lighting feeds to associated lights on contract or moving lights to suit kitchen design.
Install new electric ring main supplying kitchen.
Install new extend existing radial supply including termination point.
Difficult access to certain areas, long runs of cable, or pipe work, lifting floor boards.
Wooden Worktops to be prepared and oiled at point of installation.
Laminate Worktops to be fitted, with up stands or splash back.
Granite / Quartz or Corian Worktops to be fitted.
Install temporary surface to sink, hob or both before solid surface worktop is fitted.
Install sink tap and waste.
Move main stop tap or fit a new isolation stop tap.
Gas connection required.
Remove existing wall and floor tiles.
Plaster walls to effected areas to either re tiling standard or paint finish standard
Remove existing kitchen.
Dispose of waste associated with the installation, (Not cooling appliances.)


